2. I have no definite idea, please send me in information brochures of the equipments
3.1. Capacity expected:
Further extension:
3.2 Size of brewhouse (in hl):
3.2.1 Implementation of brewhouse:
3.2.2 Command:
3.2.3 Heating:
4. Storage and fermentation:
5. Cooling:
6. Duration of fermentation and lager storage:
7. Filtering:
8. Filling down into:
9. Beer kinds:
10. Local conditions:
Electric power supply:
Water supply:
Water temperature:
Room temperature for putting into operation?
Relative humidity:
Customer's other requirements (water preparation, heat recycling etc.):
Expected time of putting into operation:
Raw material supply required?:
After filling this form, please strike the key "Send".